vault backup: 2024-08-31 13:59:50
This commit is contained in:
parent
f274fb468f
commit
55007bf97f
@ -46,6 +46,32 @@ end: {
|
||||
*
|
||||
* Summary: Bake a banana cake
|
||||
*
|
||||
8
|
||||
*************************************/
|
||||
```
|
||||
* Inputs: none
|
||||
* Outputs: none
|
||||
**************************************
|
||||
* Pseudocode
|
||||
*
|
||||
* Begin
|
||||
* Add 3c flour
|
||||
* Add 1 1/2 tps baking soda
|
||||
* Add 1/2 tsp cinnamon
|
||||
* Add 1/2 tsp salt
|
||||
* Stir
|
||||
* Add 3 mashed bananas
|
||||
* Add 1 tsp lemon juice
|
||||
* Stir
|
||||
* Add 3 eggs
|
||||
* Add 2tsp vanilla extract
|
||||
* Stir a final time
|
||||
* Bake @ 350F for 50 min
|
||||
* Cool for 1 hour
|
||||
* End
|
||||
**************************************/
|
||||
```
|
||||
|
||||
# Walking
|
||||
## Instructions
|
||||
3. Assume an action set of {walk \<value> steps, turn to \<value> degrees}. Draw a flowchart showing a shady path and a sunny path to get from the west doors of the Engineering Building to the south-east doors of the TSC. Pick a meaningful “if” condition to select one of the two paths. Use real-world data in your design.
|
||||
|
||||
4. Represent the flowchart from problem 3 as pseudocode.
|
||||
|
||||
|
Loading…
Reference in New Issue
Block a user